New construction in Elmhurst happens mostly on established streets, where older houses come down and new ones go up, as on South Hillside Avenue and in the neighborhood of large, older homes around South Arlington Avenue.
This guide covers where to look, what new homes and teardown properties have sold for, and how the city's zoning, permits, and contractor rules shape a build. It's written for buyers deciding between a finished new home and building one on a lot of their own.
Quick Facts
- The Elmhurst City Council adopted a comprehensive rewrite of the city's Zoning Ordinance on July 20, 2026, replacing an ordinance that had not been revised since 1992.
- The median sale price for single-family homes in Elmhurst was $782,188 for July to September 2026, according to Redfin.
- Elmhurst will not issue a demolition permit unless a building permit for the replacement home is issued at the same time, or security is posted to guarantee compliance.
- Elmhurst residential building permits are valid for one year from the date of issue.
- A general contractor in Elmhurst must submit a $25,000 registration and permit bond before receiving a registration certificate.
Where are new homes going up in Elmhurst?
New homes in Elmhurst are going up one lot at a time on established residential streets. In the neighborhood of large, older homes around South Arlington Avenue, many houses have been torn down over the last 15 years to make way for new ones. South Hillside Avenue has seen a long stretch of demolitions and new construction as well, with one resident of that street telling the City Council in March 2026 that the block had been an active construction zone for more than 600 consecutive days.
Builders also post upcoming projects on their own websites before work starts. Wise Investment Builders' available-properties page, for example, lists a coming-soon new-construction opportunity on Hawthorne Avenue and notes that its listed locations are not yet under construction. Watching builder sites alongside the houses for sale in Elmhurst, IL gives you an earlier look at what's coming.
Location is a big part of why people build here. The Chicago Loop is about 19 miles away, roughly 30 to 35 minutes by car depending on traffic, and O'Hare Airport is about 15 to 20 minutes away. The Elmhurst neighborhood guide covers life in the city beyond new construction.
Elmhurst is served by Elmhurst Community Unit School District 205, but the city's edges fall into neighboring districts, and attendance is always set by address. Confirm the assignment for any lot with the district before you commit.
What does new construction in Elmhurst cost?
New construction in Elmhurst sits at the upper end of the local market. A Hillside Avenue resident told aldermen that the new homes on that street are priced at $1.5 million.
For context, the median sale price for single-family homes in Elmhurst was $782,188 for July to September 2026, according to Redfin, and Zillow puts the typical single-family home value at $667,136 in September 2026. Across Elmhurst, IL real estate as a whole, typical values run from $414,078 for lower-priced homes to $1,123,486 for higher-priced homes, according to Zillow's September 2026 figures.
Teardown buyers pay for the land and the house standing on it. In one 2024 case, a house on South Arlington Avenue bought that spring for $2 million was slated to come down so a bigger home could go up, a plan that required combining the lot with a side parcel.
At the top of the market, a six-bedroom, 9,815-square-foot mansion on East South Street sold for a record $4.2 million in 2023, according to The Real Deal. It topped the previous Elmhurst record of $3.35 million, set in November 2021.
How does the 2026 zoning rewrite affect new builds?
The Elmhurst City Council adopted a comprehensive rewrite of the Zoning Ordinance on July 20, 2026, replacing an ordinance that had not been revised since 1992. For single-family lots, the R1, R2, and R2A districts share the same use permissions, and the change is to lot size requirements, meant to better match conditions on the ground, as the city's zoning rewrite project explained.
Lot size matters because a lot of existing parcels didn't fit the older minimums. The city's 2021 Zoning Rewrite Tech Report listed a 9,000-square-foot minimum lot with 60 feet of frontage in R1, and 7,260 square feet with 50 feet of frontage in R2. It found that significant portions of both districts were nonconforming on lot area, frontage, or both. The city's zoning consultants proposed the new R2A district with a 6,500-square-foot minimum lot and a 50-foot minimum width.
Coverage is the other number to watch. Elmhurst has a nearly century-old rule, as Patch reported in 2020, that bars buildings from covering more than 30 percent of a residential lot. Before you settle on a floor plan, confirm the lot size, frontage, and coverage standards for your specific lot with the Planning and Zoning Division, which handles site-plan review and zoning-code administration.
Some rebuilds need a council vote. In July 2024 the City Council voted 12-1 to approve a lot consolidation zoning request that allowed the South Arlington Avenue teardown and a larger replacement home.
What permits does a teardown in Elmhurst need?
A teardown in Elmhurst needs a demolition permit, and that permit is tied to the plan for the new house. Demolition is on the city's Required Permit List, and the municipal code says no demolition permit is issued unless a building permit for the replacement is issued at the same time, or security is posted to guarantee compliance. The contractor must also submit evidence of insurance coverage, and the City Attorney must approve it before the permit is issued.
Site prep comes before the old house comes down. For the 2024 South Arlington Avenue teardown, the city required utility disconnections, right-of-way inspections, and fence installation before granting the demolition permit. A fence protecting parkway trees is required during demolitions, demolition contractors must give the Building Department 48 hours' notice, and failing to hose down a structure for dust control carries a $500 penalty.
The new house has its own checklist. The city's new-home permit checklist calls for stamped architectural plans, a scope of work with sewer and water service plans, electrical and plumbing plans with riser diagrams, a plat of survey, and an engineering site plan. Under Elmhurst's residential building permit requirements, every sheet of the drawings must carry the architect's or design professional's seal, signature, and license expiration date.
Applications go through the Citizen Self-Service Portal, where you can submit documents, track a permit's progress, pay fees, schedule inspections, and review inspection results. Elmhurst's acting city manager has said applicants are told the minimum turnaround is four weeks.
One more check for older houses: landmark designation is Elmhurst's only protection for historic homes from demolition, so find out a house's status before you plan around replacing it.
How do you vet a builder in Elmhurst?
Start by confirming the builder is registered with the city. A general contractor in Elmhurst must submit a $25,000 registration and permit bond before receiving a registration certificate, and each subcontractor must submit a $10,000 bond. The city can verify that a contractor's registration is up to date, a quick call to make before you sign anything.
Then ask how the builder runs a job site. New construction sites need a Code of Conduct sign posted, and the city's construction code of conduct requires erosion-control measures, adherence to the stormwater management plan, and protection for parkway trees. Violations can bring a stop-work order, a ticket, or a revoked permit, and any of those can push back your move-in date.
Work hours are set by the Building Department: Monday through Saturday from 7:00 a.m. to 6:00 p.m., and Sundays and holidays from 10:00 a.m. to 6:00 p.m. The department reviews plans, issues permits, inspects construction, and counsels prospective builders and developers on code requirements, so a builder who already knows its process tends to keep a project moving.
How long does a new build in Elmhurst take?
Building a custom home in Elmhurst happens in phases, and one local builder estimates the construction phase alone at 6 to 9 months. Corvin Construction's Elmhurst custom-home guide also estimates 2 to 3 months for design and planning and several weeks for the final walkthrough and closeout. City permit review falls between design and construction.
The permit clock matters too. Elmhurst residential building permits are valid for one year from the date of issue. Builders who go past that pay permit fees equal to half the original fee, and a house still unfinished 30 days past the deadline draws a $100-per-day fine until it's complete. Ask any builder how their schedule fits inside that year.
Two checkpoints can affect timing. After the foundation is poured, the builder must submit a certificate of elevation and a spot survey, and the city has to review and approve them before framing begins. Inspection availability may also be limited the week before, during, and after a recognized city holiday.
Frequently Asked Questions
What is the most expensive home sold in Elmhurst, Illinois?
A six-bedroom, 9,815-square-foot mansion on East South Street set the Elmhurst home sale record at $4.2 million in 2023, according to The Real Deal's June 2023 report. That sale topped the previous record of $3.35 million from November 2021. For comparison, the median sale price for single-family homes in Elmhurst was $782,188 for July to September 2026, according to Redfin.
Where can I find new construction homes for sale in Elmhurst?
New construction homes in Elmhurst turn up both as homes listed for sale and as coming-soon projects that builders post before work begins. Wise Investment Builders, for example, lists a coming-soon opportunity on Hawthorne Avenue that is not yet under construction. Following builder sites along with Elmhurst, IL homes for sale gives you the widest view of what's on the way.
Can you tear down a house and build a new one in Elmhurst?
Yes, Elmhurst allows teardown rebuilds, with the demolition permit tied to the new home. The city issues a demolition permit only alongside a building permit for the replacement, or after security is posted. A house designated as a landmark is protected from demolition, and projects that combine lots need a zoning approval from the City Council.
How long is an Elmhurst residential building permit valid?
An Elmhurst residential building permit is valid for one year from the date it's issued. Builders who run past that year pay permit fees equal to half the original fee. A house still unfinished 30 days after the deadline is fined $100 per day until it's complete.
How can I check that an Elmhurst builder is registered?
The City of Elmhurst can confirm whether a contractor's registration is up to date. To register, a general contractor must post a $25,000 registration and permit bond, and a subcontractor must post a $10,000 bond. Make that check before you sign a building contract.
Building new in Elmhurst goes more smoothly when you understand the lot, the permits, and the builder before you commit.
Bomba & Mancini works with buyers and sellers across Chicago's western suburbs, and Bryan Bomba learned real estate as a specialized real estate appraiser, a useful background when you're weighing a teardown property against a finished home. You can meet the Bomba & Mancini team as you start looking at new construction in Elmhurst.